Design-Build of P-052 National Guard Readiness Center
All Case Studies
$33,184,524ConstructionDesign-Build

Design-Build of P-052 National Guard Readiness Center

U.S. Army National Guard (GUARNG)Barrigada, Guam9/30/2022 – 2/26/2025

Project Overview

Design-build delivery of the 36,139 SF P-052 National Guard Readiness Center for the 1224th ESC and 1-244 AVN of GUARNG, including arms vaults, classrooms, unit locks, plus options for a photovoltaic system, training bay, and MEC/UXO/MPPEH support.

Scope of Work

  • 36,139 SF readiness facility
  • Arms vaults · classrooms · unit locks
  • Photovoltaic system option
  • Training bay & secure construction
  • MEC / UXO / MPPEH coverage

From the Field

Design-Build of P-052 National Guard Readiness Center — photo 1
Design-Build of P-052 National Guard Readiness Center — photo 2
Design-Build of P-052 National Guard Readiness Center — photo 3

Doing the right thing, in the right way, at the right time, in the right place — for the right reason, with sincerity. The first time.

The Meaning of Kīnā'ole