
All Case Studies
$33,184,524ConstructionDesign-Build
Design-Build of P-052 National Guard Readiness Center
U.S. Army National Guard (GUARNG)Barrigada, Guam9/30/2022 – 2/26/2025
Project Overview
Design-build delivery of the 36,139 SF P-052 National Guard Readiness Center for the 1224th ESC and 1-244 AVN of GUARNG, including arms vaults, classrooms, unit locks, plus options for a photovoltaic system, training bay, and MEC/UXO/MPPEH support.
Scope of Work
- 36,139 SF readiness facility
- Arms vaults · classrooms · unit locks
- Photovoltaic system option
- Training bay & secure construction
- MEC / UXO / MPPEH coverage
From the Field



“
Doing the right thing, in the right way, at the right time, in the right place — for the right reason, with sincerity. The first time.
The Meaning of Kīnā'ole


